Research Article Open Access

Schedule Planning for Repairing Power Supply System

Kuo-Wei Lin1 and Chein-Jen Kang1
  • 1 Department of International Business, Hsuan Chuang University Hsinchu Taiwan, 30092, R.O.C., Taiwan

Abstract

Problem statement: Taiwan is located in the tropical ocean areas. The strong typhoon in summer often causes the collapse of electric transmission towers and results in power outages that seriously affect people’s lives and industrial production. Approach: In light of this situation, this study aims to employ project management techniques of Theory of Constraints (TOC) to develop a practical TOC model to quickly repair the towers and restore power supplied system. Results: The actual application had verified that the research model could not only shorten the duration of work but also save the manpower and material expenses. Conclusion: It once again proved the excellent results of reparation operations by applying TOC to project management.

American Journal of Applied Sciences
Volume 9 No. 6, 2012, 934-937

DOI: https://doi.org/10.3844/ajassp.2012.934.937

Submitted On: 19 February 2012 Published On: 24 March 2012

How to Cite: Lin, K. & Kang, C. (2012). Schedule Planning for Repairing Power Supply System. American Journal of Applied Sciences, 9(6), 934-937. https://doi.org/10.3844/ajassp.2012.934.937

  • 3,645 Views
  • 2,828 Downloads
  • 1 Citations

Download

Keywords

  • Theory of Constraints (TOC)
  • buffer management
  • project management
  • critical path method
  • Program Evaluation and Review Technique (PERT)
  • electric transmission